STEP / IGES
3D solids for strap cavity layout. Name the revision in the file.
Start RFQ →Eligibility applies to qualified business buyers and is confirmed after we review your product, quantity, destination, and sourcing requirements.
This Instant Quote page walks through how a custom liquid silicone rubber injection molding brief is assembled for a wearable strap overmold. There is no automatic price engine on this site. After the form, send CAD on the confirmed reply channel.
3D solids for strap cavity layout. Name the revision in the file.
Start RFQ →Datums, flash notes, and Shore A. Keep it paired with the 3D.
Start RFQ →LSR versus HCR, pigment, post-cure. Alternatives stay marked open.
Start RFQ →T0/T1, first lot, EAU. Tooling class depends on these numbers.
Start RFQ →Ship-to country and Incoterm. Duties stay visible if excluded.
Start RFQ →
A complete strap brief received on a US business morning can be routed the same day. A factory reply is not promised in 24 hours. The example only shows how this desk sequences questions so custom liquid silicone rubber injection molding quotes stay comparable.
STEP + PDF with one revision ID. Missing 2D notes become open assumptions.
Tooling, piece, peel test, oven cycle, inspection, and freight listed separately.
A gate, chemistry, or draft change starts a new comparison row, not a silent overwrite.
Lead time, certificates, cavity counts, and traveler oven hours stay unmarked until the plant writes them.
| Choice | Buyer check |
|---|---|
| Aluminum / MUD | Accept shorter shot life for a faster wearable T1? |
| Steel | Accept higher NRE for buckle-flash stability and EAU? |
| Cold runner | Required for LSR waste control, or still open? |
| Choice | Buyer check |
|---|---|
| LSR vs HCR | Skin-comfort LSR versus mill-mixed HCR on the same strap |
| Post-cure traveler | Printed oven hours before Shore is scored, or as-molded only |
| Alternative grade | Written accept required before a substitute ships |
| Choice | Buyer check |
|---|---|
| Incoterm | EXW vs DDP changes landed cost more than piece price |
| Validity | How many days the plant holds NRE and piece price |
| Budget note | Optional amount or range, currency, per unit or whole order |
Drawing, LSR grade, quantity, inspection, destination. Linked to the buyer note, not a downloadable binary.
Open the noteProcess, acceptance, delivery, and landed-cost questions for a plant reply.
Open the noteNo website upload. After the RFQ we confirm a reply channel for STEP/PDF.
Start the RFQ
If a factory offers a different gate, LSR versus HCR swap, or Incoterm, write the change as an alternative. Custom liquid silicone rubber injection molding awards stay clearer when the original strap row remains visible.
Submit procurement requirementsEligible sourcing support may be available up to 3% after requirement review.
Eligibility applies to qualified business buyers and is confirmed after we review your product, quantity, destination, and sourcing requirements.
This is not a fixed discount, lowest-price promise, or a statement that every order receives the same support.
Submit procurement requirements